Skip to content
MajorCooling 07983 878341
Request a quote

F-Gas registered · Hampshire

Air conditioning

Cooling and heating,
properly sized


Wall-mounted splits through to full VRF. Installed so the equipment disappears into the building and keeps working long after handover.

Principal bedroom with cove-lit ceiling and flush linear diffusers

01

Ducted & concealed


The indoor unit sits above the ceiling and the only thing in the room is a slot diffuser — or nothing at all, where supply and return are set into a bulkhead or cove.

It is the option that suits high-specification interiors, and the one that has to be planned earliest: duct routes, access panels and condensate falls all need to be agreed before the ceilings are boarded.

Typically installed as

  • Ducted units above ceiling voids and bulkheads
  • Linear slot and continuous slot diffusers
  • Ceiling cassettes in flat soffits
  • Concealed returns through joinery and cornice
External condenser unit and line covers installed on a brick elevation

02

Splits & multi-splits


A single wall unit for a hot bedroom or a home office, or one outdoor unit serving several rooms. The retrofit option for houses that are already finished.

Most of the work is in the routing: getting pipework and condensate from the indoor unit to the outdoor unit without cutting through anything that matters, and in trunking that follows the lines of the elevation rather than crossing them.

Typically installed as

  • Single split — one indoor, one outdoor
  • Multi-split — up to several indoors on one outdoor
  • High-wall, low-wall and floor-standing units
  • VRF for whole buildings and commercial floors

03

Section through
a ceiling void


What a concealed installation actually looks like above the ceiling — and why the routes have to be agreed before anything is boarded.

Structural soffit Finished ceiling Void depth 300–400 typ. Ducted fan coil Return Plenum Supply Fall to drain 01 02 03 04 05 06 07 08 Section A–A · concealed ducted installation Dimensions in mm · typical
01Ducted fan coil unit on anti-vibration mounts and drop rods
02Insulated flexible duct connections, kept short and gently set out
03Plaster-in linear slot diffuser — the only visible element
04Return air grille and return path back to the unit
05Access panel, positioned so the unit is reachable after handover
06Condensate drain on continuous fall to a gravity discharge
07Insulated refrigerant pipework, liquid and suction, to the condenser
08Finished ceiling line — nothing below it but the slot

04

Siting the
outdoor unit


Where the condenser sits decides how well it runs, how easily it can be serviced, and whether it passes an acoustic assessment at the neighbour's window.

Host wall Condenser Discharge Service clearance Below Front Line cover Boundary Nearest habitable window Assessed sound path Distance to assessment point 01 02 03 04 05 06 External unit · siting and acoustic assessment
01Service clearances kept clear on all four faces so the unit can be worked on
02Anti-vibration mounts between unit and bracket — structure-borne noise starts here
03Line covers following the lines of the elevation, not crossing them
04Condensate discharged away from paths and thresholds
05Site boundary
06Sound assessed at the neighbour's nearest habitable window, not at 1 m from the unit

05

How a job runs


01

Survey

A site visit to measure the rooms, check the fabric and the glazing, and find workable routes for pipework, condensate and power before anything is priced.

02

Design & quote

Equipment sized to the actual heat load, not the room count. A written quote listing the units, the indoor and outdoor positions and what is included.

03

Install

First fix alongside the other trades, then second fix once ceilings and joinery are closed up. Cores drilled, brackets set, condensate falls checked as we go.

04

Commission & certify

Systems pressure-tested, evacuated, charged and run on heating and cooling. Refrigerant logged and paperwork handed over.

05

Service

Planned maintenance to keep filters clean, drains clear and manufacturer warranties valid — with F-Gas leak checks where the charge size requires them.

06

Common questions


Do I need planning permission for air conditioning?

For most houses the outdoor unit falls under permitted development, provided it sits within size limits, is not on a wall facing a highway and the property is not listed or in a conservation area. Flats, listed buildings and conservation areas usually do need consent. We will tell you which applies at survey.

Will it heat as well as cool?

Yes. Every system we install is a heat pump — it reverses to provide heating in winter, typically at a lower running cost than electric heating and often lower than gas, depending on your tariff.

How disruptive is the installation?

A single split in an existing house is usually one to two days. A fully ducted system in a new build or refurbishment is phased with the other trades: first fix before the ceilings close, second fix once plastering and joinery are complete.

How often does it need servicing?

Annually for domestic systems, and more frequently for commercial equipment or anywhere with heavy dust or grease. Servicing keeps manufacturer warranties valid; systems above certain refrigerant charges also require F-Gas leak checks by law.

Get a quote


Tell us the property, the rooms and roughly when you need it done. You will speak to an engineer, not a call centre.

Call 07983 878341